Projects

Jobs that need to be done:

There are a lot of projects that will need to be completed before we are able to open the School Buildings up for community use.

This will be a ever evolving and changing list so be sure to check back for updates!
If there is anything you or someone you know can help out with, from donating time for labour or donating materials.  Contact us and let us know what you can do.

  1. Cutting of grass on fields and around buildings

  2. ​Replace dirt into culverts cutout to comply with Kaipara District Council as no Resource Consent issued for any drainage work.

  3. Removal of blackberry bushes around buildings including large patch around pool buildings

  4. Replanting gardens

  5. Community garden, orchard, native plant nursery

  6. Fencing around property

  7. Replace playground

  8. Replace fence at end of courts

  9. Resurface courts

  10. Replace or repair water tanks

  11. Check Septic Tank for compliance

  1. Clearing gutters and/or replace rotting areas

  2. Washing buildings

  3. Closing up of chimney flu's

  4. Replace broken windows

  5. Rubbish removal

  6. Prepare list of work required for inside of building

  1. Clean up inside all areas

  2. Reinstate lunchroom

  3. Refit Toilets - boys & girls

  4. Reinstate one classroom for education

  5. Reinstate one classroom for community events, meetings, activities, birthday etc.

  6. Replace fireplaces to meet current standards including KDC Consents and NZ Building Code

  • Swimming Pool Complex

    1. Wash inside and out of buildings

    2. Reinstate all bathrooms

    3. Reinstate swimming pool

    4. Reinstate showers and toilets

    5. Reinstate kitchen

    6. Replace or repair water tanks

  • School House

    1. Replace roofing and spouting

    2. Replace fireplace (deemed unsafe and non-compliant of building code April 2020)

    3. Replace Stove

    4. Replace carpets and lino through dwelling

    5. Repair shower leak

    6. Comply to Insulation Codes - replace ceiling insulation

    7. Renovate interior of dwelling

    8. Repaint exterior of dwelling

    9. Correct flooding and drainage issues around dwelling

outside7

outside7

Hallway1

Hallway1

classroomtwo3

classroomtwo3

classroomone2

classroomone2

classroomone10

classroomone10

boys4

boys4

hallway4

hallway4

outside12

outside12

staffroom1

staffroom1

outside18

outside18

boys2

boys2

outside21

outside21

Equipment shed

Equipment shed

© 2020 by Tutamoe Community Collective. Proudly created with Wix.com

  • Facebook App Icon
  • Twitter App Icon
  • YouTube App Icon
This site was designed with the
.com
website builder. Create your website today.
Start Now